Airtight construction controls the flow of air and therefore the flow of airborne heat and moisture into and through the building envelope. It needs to be approached in a comprehensive manner on all sides of the envelope.
The most difficult aspect of air sealing is where dissimilar materials intersect, especially in complex geometry. The details that follow illustrate strategies for tackling some of the most commonly encountered intersections.

Foundation to Sheathing

Foundation to Sheathing Detail | Hammer & Hand

A. JOINT AND SEAM SEALANT OR APPROVED TAPE
B. SILL SEAL

1. To function as air barrier, foundation must be structural reinforced concrete.
2. Prevent sheathing-to-concrete contact.

5.2.2

 

At Sheathing

Air Sealing At Sheathing Detail | Hammer & Hand Best Practices Manual

Materials:

A. RIGID PANEL WITH INTEGRAL WRB (ZIP SHEATHING OR SIMILAR)
Apply approved sealant at all joints, seams, and penetrations.
Apply fluid applied membrane at interior of punched openings.
B. RIGID PANELS WITH FLUID APPLIED WRB
Apply fluid applied system at punched openings, seams, and penetrations.
Cover entire exterior plane of envelope with fluid applied WRB.
C. RAW RIGID PANEL READY FOR FABRIC WRB
Apply fluid applied system at punched openings, joints, and penetrations.
Tile-in fabric WRB product into wet set transition sheets.
D. SEE SECTION 5.1  DUCT FLASHING WITH A RAIN SCREEN

Air Barrier: Exterior Wall Sheathing to Interior Ceiling Transition

Air Barrier: Exterior Wall Sheathing to Interior Ceiling Transition | Hammer & Hand BPM

1. Install perimeter rip of rigid panel before ceiling framing/trusses are set, extend past interior edge of top plate a minimum of 1” for flat ceiling over top plate.
2. Seal perimeter rip panel edges prior to setting trusses.
3. For vaulted ceilings extend rigid panel 1/2” past inside of top plate.

 

Wall to Ceiling/Roof
Wall to Ceiling/Roof | Hammer & Hand Best Practices Manual
A. AIR BARRIER AT CEILING
B. JOINT AND SEAM SEALANT OR APPROVED TAPE

 

Wall to Ceiling/Roof Detail 2 | Hammer & Hand BPM
A. 1.5″ SERVICE CAVITY
B. DRYWALL
C. RIGID PANEL WITH SEALANT OR TAPE

 

If Vaulted Ceiling with Exterior Air Barrier, Seal Wall to Roof Sheathing

 

Vaulted Ceiling with Exterior Air Barrier | Hammer & Hand
A. IF VAULTED CEILING, INSTALL OVERHANGS AS ADDITIONAL FRAMING SYSTEM ABOVE STRUCTURAL SHEATHING
B. THIS SHEATHING LAYER IS ALSO THE AIR BARRIER AND WILL BE SEALED AT ALL PANEL EDGES
C. RIGID INSULATION OR MINERAL WOOL BETWEEN FRAMING. INSULATION TO BE 1″ SHALLOWER THAN FRAMING TO ALLOW FOR VENTILATION CHANNEL

D. INSULATION ABOVE OVERHANG FRAMING TO BE PROVIDED WITH VENTED NAIL BASE OR SIMILAR

 

Continue to 5.3 Insulation >>>

creative-commons
Hammer & Hand’s Best Practices Manual is covered by a Creative Commons license that allows for redistribution, commercial and non-commercial, as long as content is passed along unchanged and in whole, with credit to Hammer & Hand. If any piece is shared online, it is required to credit Hammer & Hand and include a link to the relevant source page at https://hammerandhand.com/best-practices/manual/.