By Daniel

Building a new home in Portland or Seattle is a major investment — one that requires clarity around costs and the factors that influence them. While specific prices fluctuate with the market, the categories that shape your total budget remain consistent:

  1. Land & Location: The specific characteristics of your chosen lot, from topography to existing utilities, significantly impact overall project costs beyond the initial purchase price.
  2. Professional Fees: Hiring architects, engineers, and other consultants for detailed planning is a crucial investment, typically costing 12-25% of the construction budget, which helps prevent expensive errors during the build.
  3. Permitting & Fees: Jurisdictional permits and system development charges for infrastructure are necessary governmental costs that can add 3-5% or more to the total project expense.
  4. Site Development: Preparing the land for construction involves essential work like grading, utility connections, and access, with costs varying dramatically based on the property’s condition.
  5. Construction Costs: The core expense of building the home is typically calculated per square foot and varies by location, with high-performance homes adding a premium to the base cost.
  6. Interior Finishes & Fixtures: Your personal selections for everything from appliances to cabinetry have a major influence on the final budget, offering a wide range of cost possibilities.


Let’s break each of these six cost factors down.

1) Land

Location, location, location.

The lot itself can be a major factor in determining the cost of your new home. Beyond the purchase price, lot characteristics can significantly affect construction expenses. Ask these questions when evaluating land:

  • Topography: Is the lot flat, gently sloping, or steep? Accommodating slope can add $100k–$200k or more to foundation costs.
  • Soils & Geotech: Is the ground stable, or will pilings/shoring be required? These measures can add $100k–$300k. Always check if a geotechnical report is available.
  • Utilities: Are water, sewer, gas, and electricity available on site? If septic is required, has a perc test been done?
  • Site prep: Will you need roads, grading, tree removal, or bridges before building can begin?
  • Existing structures: Is demolition required?
  • Size & zoning: Does the lot meet your space needs, and is it already occupied or encumbered? Are there any Environmental Overlay Zones or other zoning restrictions?


In Portland and Seattle, lots typically range from $100k to $700k or more. Because easily buildable urban lots are scarce, many buyers opt for properties with older homes ready for teardown, or double lots that can be split. Increasingly, buyers are also looking beyond the urban core for available land.

Local real estate agents are invaluable partners in finding the right property — and in understanding how neighborhood demand affects lot pricing.

2) Costs for Architects, Designers & Consultants in the PNW

Architectural services usually cost 10–20% of construction costs. While “canned plans” from the internet may cost far less, they typically include only a handful of sheets compared to the 50+ sheets and detailed specifications produced by a licensed architect.

At Hammer & Hand, we’ve long said: “Every dollar spent with an architect is a dollar saved in construction.” Detailed drawings prevent costly mistakes, streamline the build, and ensure every team member works toward the same vision.

In addition to an architect, you’ll likely need consultants such as:

  • Structural engineers
  • Geotechnical engineers
  • Civil engineers


These could add another
2–5% of construction costs, depending on site and design complexity.

3) Permits

Permit requirements and fees vary by jurisdiction. In general:

  • Permit fees: Around 1–2% of total project cost
  • System development charges: Sewer, transportation, and other infrastructure fees may add another 2–3% or more for new homes on previously undeveloped lots.

 

4) Site Development

Site development prepares the lot for construction and may include:

  • Roads and driveways
  • Sewer or septic systems
  • Drainage solutions
  • Tree removal
  • Geotechnical stabilization


On flat, serviced city lots, costs may be minimal. But sloped or rural properties often require significant investment.

5) Construction

Home building “cost per square foot,” usually refers only to construction — not land, permits, or site development.

In 2025, average ranges are:

  • Portland: $600–$900 per square foot
  • Seattle: $800–$1,000 per square foot

 

High-performance or Passive Houses add about 10–20% more.

At Hammer & Hand, much of this work is self-performed by our experienced team. Our craftsmen, carpenters, and project managers bring decades of expertise to every home, and directly frame, finish and manage every home.   

6) Furniture, Fixtures & Finishes

Think of this like asking, “How much does a bag of groceries cost?” The answer depends entirely on what you put inside.

Your selections — appliances, flooring, lighting, cabinetry, tile — can swing the final budget significantly. Throughout the process, we collaborate with you and your architect to align choices with your goals and budget.

We maintain full transparency, providing detailed billing summaries so you always know where your money is going. Our role is to help maximize value — finding ways to adjust costs without compromising the vision of your project.

New Home Construction Case Study Cost Examples

No project is exactly the same, but here are some potential example prices you could expect from a new home build. 

Example 1: 2,500 sq. ft. Urban Infill Home in Portland

  • Lot: $550,000 (teardown in the urban core)
  • Architect & Engineers: $150,000
  • Permits: $25,000
  • System Development: $0 (existing home)
  • Site Development: $25,000 (demolition)
  • Construction: $1,400,000
  • Furniture & Fixtures: $50,000

 

Example 2: 4,000 sq. ft. Net Zero Wine Country Home in the Willamette Valley

  • Lot: $300,000
  • Design & Engineering: $225,000
  • Permits: $25,000
  • System Development: $30,000
  • Site Development: $250,000 (roads, utilities, septic)
  • Construction: $3,200,000
  • High-Performance Envelope: $250,000
  • Solar & Battery: $100,000
  • Furniture & Fixtures: $150,000

 

Example 3: 1,800 sq. ft. Home + 700 sq. ft. ADU (Urban Split Lot) in Seattle

  • Lot: $100,000
  • Design & Engineering: $200,000
  • Permits: $25,000
  • System Development: $40,000
  • Site Development: $5,000
  • Construction: $1,800,000
  • Furniture & Fixtures: $75,000

 

Why build your dream home with Hammer & Hand?

Cost isn’t the only factor when building a new home. Choosing the right custom home builder is essential to ensuring your investment becomes the home you’ve imagined.

For over 30 years, Hammer & Hand has built its reputation as a leading Portland construction company and Seattle design builders for precision, craftsmanship, and transparency. Our team of project managers and career carpenters ensures that every home is built with care, clarity, and collaboration.

Ready to build? Contact us to discuss your project and discover why we’re the Pacific Northwest’s trusted choice for residential construction.

Have more questions? Please see these other helpful resources:

Recent Posts